Apartments
Shriram Properties
Shriram 107 SouthEast Phase 3
Near Electronic City Phase 2
2 and 3 BHK
- Matched to registration
- Available for this phase
- Price not verified
6 projects in our directory. We list what we can source and mark the rest as not verified. This page is not an endorsement by the developer.
Apartments
Shriram Properties
Near Electronic City Phase 2
2 and 3 BHK
Apartments
Shriram Properties
Koramangala 1st Block
3 and 4 BHK
Plotted development
Shriram Properties
Doddaballapura Highway
Luxe plots
Apartments
Shriram Properties
Near Electronic City toll / Bommasandra
2 and 3 BHK
Apartments
Shriram Properties
NH 844, Electronic City corridor
2 and 3 BHK
Apartments
Shriram Properties
Jalahalli / near BEL Road
2, 2.5, 3 and 3.5 BHK
Developer states: From ₹94 lakh all-inclusive on developer campaign checked 2026-09-26
Short answer
Shriram Properties has 6 projects in the RERA Bangalore directory, and 6 are linked to a Karnataka RERA registration by exact number. The projects sit in Doddaballapura Highway (1), Jalahalli (1) and Koramangala 1st Block (1) as recorded in our source sheet, among 6 areas. RERA completion dates are on file for 6 of 6, from May 2025 to April 2030, and none of this has been re-checked on the live portal today.
Data last checked 26 Sept 2026. Not re-checked on the live portal today.
Shriram Properties appears in our directory with 6 projects. Every one is linked to a RERA registration by exact number.
Together those listings carry 6 matched registrations. 2 of those listings state a unit count, adding up to 1,036 units. Counts are as filed and are not a statement about what is still for sale.
By type: 5 apartments and 1 plotted development.
The projects sit in 6 areas in our source sheet: Doddaballapura Highway (1), Jalahalli (1), Koramangala 1st Block (1), Near Electronic City Phase 2 (1), Near Electronic City toll (1) and Nh 844 (1). These are source-sheet areas, not surveyed positions.
Shriram Properties projects have these districts recorded: Bengaluru Urban (5) and Bengaluru Rural (1).
Using the same rule as our area pages, Shriram Properties's listings split into 6 new. A new project is one still being built or launched; an existing building is stated completed or past its filed date. Where the data conflicts we show neither badge.
Stages as filed: New Project Launch (5) and Ongoing (1).
Shriram Properties: registration status across the linked records is 6 approved.
Brochures: 6 matched to the exact phase. A shared brochure is not treated as an exact-phase document.
Shriram Properties listings name these configurations: 3 BHK (5 projects), 2 BHK (4 projects), 2.5 BHK (1 project), 3.5 BHK (1 project), 4 BHK (1 project) and Plot (1 project). Which sizes are still available is not verified.
RERA completion dates are on record for 6 of 6 listings, running from May 2025 to April 2030.
1 of 6 show a developer asking price, labelled as a claim and not verified.
To check Shriram Properties, use this general explanation, based on the official Karnataka RERA portal. A developer can hold several registrations, one per project or phase.
Each Shriram Properties page shows the registration record, developer claims and data gaps for that project.